2017年5月10日星期三

welded pipe equipment features

1.Processing speed: under normal circumstances preparation and roll welding part 5-7 class, second class homework, 10 people a day can produce more than 20 12 meters long finished cage (preparation, roll welding, reinforcement installation, detection pipe installation, installation guide pad block etc.), for high speed railway construction in 1 m pile cage once a Nissan 75 day 9 meters of cage (675 M / day) the production record, work efficiency very high.
2.Processing quality is stable and reliable: because of the use of mechanical operations, the main reinforcement, the pitch of the winding is uniform, the cage diameter is consistent, the product quality is fully meet the standard requirements. In the actual manual production of reinforced cage engineering supervision almost every day to processing site inspection, after the use of the mechanical processing, supervision of mechanized processing of steel reinforcement cage basic implementation of the "exemption." 
3.The stirrup without lap, compared with the manual operation saves 1% materials, reduces the construction cost.
4.Because of the distribution of the main reinforcement on the circumference of the uniform, the number of reinforcement cage is very convenient, saving the lifting time.

没有评论:

发表评论